Project |
Pool of Cleveland Residence |
|
Classification |
Residential |
|
Total Installation Time |
5 Days |
|
Total Piers Intstalled |
8 Hydraulically Driven Piers |
A sprawling hillside residence was experiencing settlement on
an interior swimming pool deck and surrounding atrium. Difficult terrain and a large
deck limited access and added additional time to the job.
After reviewing all aspects of the job, it was decided that six
exterior and two interior piers would be required to raise the atrium. The pool
deck would then be mudjacked to complete the repair.
All piers were advanced to an average of 12 feet and the entire
structure was raised. After all the floors were leveled, the wood flooring and deck
were reassembled. The homeowners were happily swimming and enjoying their deck by
the weekend.
|