Project Pool of Cleveland Residence
Classification Residential
Total Installation Time 5 Days
Total Piers Intstalled 8 Hydraulically Driven Piers

Pool of Cleveland ResidenceA sprawling hillside residence was experiencing settlement on an interior swimming pool deck and surrounding atrium. Difficult terrain and a large deck limited access and added additional time to the job.



 

Pool of Cleveland ResidenceAfter reviewing all aspects of the job, it was decided that six exterior and two interior piers would be required to raise the atrium. The pool deck would then be mudjacked to complete the repair.



 

Pool of Cleveland ResidenceAll piers were advanced to an average of 12 feet and the entire structure was raised. After all the floors were leveled, the wood flooring and deck were reassembled. The homeowners were happily swimming and enjoying their deck by the weekend.